There are 3 large logistics warehouses in this project, covering a total area of 29948m, which are medium-sized general logistics warehouses. The warehouses adopt door type steel structure, fire resistance grade 1, and have a designed service life of 50 years.
The warehouse structure of this project does not allow all lifting doors to go up and down vertically. In order to save indoor space, the company cooperates with customers to make large opening rails. The hydraulic platform contains emergency stop function, which makes it more safe and convenient for customers to use.
The solution provided by Fastlink: insulated PU sectional doors, aluminum single plank sectional door, dock levellers,